faq
  • 2018-03
    Generally speaking, for the use of limestone bucket elevator, the construction site should be basically completed and cleaned up, and there is no dust or other pollution. Make sure the ventilation is good, if necessary, the exhaust fan should be forced to ventilate.
  • 2018-03
    Vertical bucket elevator is widely used for vertical transportation of various scattered materials. Here PK Machinery will share some notes about operation instruction and maintenance management.The use of vertical hoist should follow the principle of "check before operation, observation during operation, maintenance after operation".
  • 2018-03
    TH series bucket elevator working principle: TH series bucket elevator is suitable for conveying powder, granular and small pieces of non-abrasive small material. TH-type is a chain bucket elevator using mixed or gravity discharge, digging loading.
  • 2018-03
    Chain bucket elevator is a kind of vertical lifting equipment widely used in industrial and mining products, chemical processing and production, grain processing and feed processing. It has the advantages of high elevation, stability, small area and good tightness, suitable for carrying powdery and small bulk materials.
  • 2018-02
    TD belt bucket elevator is featured by its complete specification, large capacity, high lifting height, stable operation and long service life, and it is widely used for transporting bulk, granular and small pieces of material, such as coal, cement, chemical fertilizer, sand, grain and so on
  • 2018-02
    Bucket elevator power motor lower,by flow -through feeding,Induced discharge,High-capacity hopper-intensive arrangement with almost no material return and digging in the material lift, so less inefficient power.
  • 2018-02
    Bucket elevator base plate and bucket collision, adjust the base of the elastic device, so that the chain tension.
  • 2018-02
    The chain is an important part of the NE bucket elevator.
  • 2018-01
    Bucket elevator has significant advantages with a large capacity, stable and reliable operation, long service time and others
  • 2018-01
    Setting a large umbrella cover on the top of discharging point of bunker,and install the switch valve on the air pipe of each umbrella cover,there is no any enclosed facilities on the bunker and conveyor
 793   Home Previous 3 4 5 6 7 8 9 10 11 12 13 14 Next Last